Blog

launches

How to launch an indie product on MakerHunt

Practical UTC launch playbook for MakerHunt: badge or pay, checklist, launch-day votes, and what to do after Product of the Day.

9 min read

Launching an indie product is not one button. You need a clear listing, a place people can find you, proof that you ship, and a day where strangers can upvote and comment. This is the MakerHunt version of that stack.

For the broader startup essay see how to launch a startup 2026. This post is the MakerHunt launch checklist in prose: what to decide, what to prepare, what happens at 09:00 UTC, and what most people skip after the day closes.

For the wider landscape (Product Hunt, directories, forums), see Product Hunt alternatives 2026. For naming traps (Featured-on vs paid Featured), see launch types.

What we do not sell

Before the checklist: get the economics straight.

  • We do not sell Product of the Day. Votes decide ranks after you are live.
  • We do not sell a free calendar picker months ahead. Free and paid launches schedule for the next UTC launch day after crawl or payment.
  • We do not invent domain ratings or traffic guarantees. Proof stays factual (honest DR and proof).
  • Sidebar sponsor (€29/mo) is a separate product from launch types. It is not a shortcut to PotD.

Paid tiers buy skip-crawl and feed chrome. That is it. Details on pricing.

0. Decide free vs paid

PathWhat you doWhen you go live
FreePut Featured-on markup on your homepage, pass crawlNext UTC day after crawl (09:00)
Premium €7Pay, skip badgeNext UTC day after payment
Featured €19Pay, feed chrome + home Featured slotSame schedule

Free is the default path when you can host the homepage badge. Paid is for skipping the crawl or buying visibility, not for buying Product of the Day.

Pick free if you can put a visible Featured-on badge on the apex homepage and you are fine waiting until the next UTC day after a green crawl. Pick Premium if the badge is a non-starter (client site, brand guidelines, no homepage control). Pick Featured if you want the home Featured grid chrome.

Longer breakdown: MakerHunt pricing explained and launch types.

1. Prep the product site

Before you open submit, fix the product page so the listing does not look like a placeholder.

Homepage and product clarity

  • Homepage loads without a login wall for the badge (free path). Crawl sees initial HTML, not your post-login dashboard.
  • One clear sentence for what the product does. You will reuse it as the tagline (≥10 characters at submit).
  • Logo that reads at 48–56px on a dark hunt row. Tiny wordmarks disappear.
  • Optional but useful: cover image, X URL, affiliate program URL if you have one.

Free-path badge

Paste the badge from legal/badges. Prefer light or dark SVG under /badges/featured-on*.svg to match your background. Read Featured-on and crawl and the longer badge guide so you know what we fetch.

Common prep failures (fix before submit):

  • Badge only on /press or a blog post
  • Client-only React markup that never appears in the first HTML response
  • Wrong image URL or stripped rel / link target
  • Tagline that is a slogan (“Ship faster”) with no noun

Paid-path prep

You still need a solid listing. Skip-crawl does not skip a weak logo, empty categories, or a site that 500s. Checkout schedules the next day; it does not polish your copy.

2. Work the launch checklist

Open the launch checklist. It is local progress in the browser, not a gate and not synced to your account. Typical order:

  1. Name, URL, tagline (≥10 characters)
  2. 1–3 categories that match how people browse (categories)
  3. Pricing model + platforms
  4. Logo (and cover if you have one)
  5. Badge live + crawl green (free) or checkout complete (paid)
  6. Soft announce to your own audience the evening before UTC launch day

Use the checklist as a preflight, not as a substitute for reading FAQ. If you are stacking Product Hunt the same week, sequence energy: MakerHunt day and PH day both need babysitting. Do not schedule both for the same UTC morning unless you have help.

3. Submit and wait for schedule

Free path

On free, crawl must pass (or an admin override). Status moves toward scheduled for the next calendar launch day. There is no free calendar picker for months ahead.

If crawl fails: fix homepage markup, re-run crawl from the dashboard, or pay / ask for a manual override. Do not keep resubmitting the same broken embed.

Paid path

Webhook schedules the next day and skips crawl. Complete payment from submit or the pending-payment path if checkout was interrupted. Premium gets the Premium pill. Featured gets Featured chrome and a home Featured grid slot.

Scheduling facts

  • Empty days still run. We do not cap how many products can launch on a day.
  • “Next day” means the next UTC launch window after crawl or payment clears, not “whenever you feel ready next Tuesday in your timezone.”
  • Timezone detail: launch day UTC and UTC launch day playbook.

4. Evening-before checklist (local evening before 09:00 UTC)

Treat this as ops, not vibes.

  1. Confirm dashboard status is scheduled for tomorrow’s UTC date (or ask admin if stuck).
  2. Draft three posts: open (MakerHunt URL + one sentence), mid-day (reply prompt or screenshot), near-close (one concrete update).
  3. Soft ping your warm list the evening before: “We launch on MakerHunt at 09:00 UTC. Link tomorrow.”
  4. Pin a first maker comment draft: problem, who it is for, what you want feedback on.
  5. Sleep relative to UTC. Europe: morning open. US Pacific: still the previous calendar evening when the day opens.

More comment/upvote prep: prepare launch day comments and upvotes.

5. Launch day (09:00 UTC)

When the clock opens:

  • Your project is ongoing on the home Today feed.
  • Signed-in users can upvote (including you) and comment.
  • One vote per user per project (toggle off by voting again).

Day-of playbook

  1. Share the MakerHunt URL, not only your marketing site. Votes and comments live on the hunt page.
  2. Self-upvote once if you want. It is allowed. Multi-account farming is not a supported strategy (votes and PotD).
  3. Post your pinned maker comment early: problem, pricing honesty, one ask.
  4. Ask for specific feedback in replies (confusing copy, pricing, onboarding), not only “please upvote.”
  5. Reply to every real comment the same day. Silent launches look abandoned.
  6. Mid-day UTC: one update (fix, screenshot, customer quote). Near close: one last honest ask if you have news.

Day-of failure modes

FailureWhy it hurtsFix
Only share homepagePeople never see the vote buttonLead with MakerHunt link
Empty threadLooks dead on TodayPin maker comment at open
Farm accountsWaste + trust hitOne account, real users
Ignore timezoneYou sleep through Europe morningCalendar in UTC
Expect Featured = PotDWrong productChrome ≠ rank

Deep dive on ranks: PotD, votes, and ranking.

6. Day close and ranks

Around the next 09:00 UTC, yesterday’s ongoing launches become launched. Top three by upvotes get daily ranks 1–3. Ties go to whoever reached the count first. Zero-vote products still launch; they just get no PotD badge.

Owners copy embeds from /projects/[slug]/badges. Week and month standings roll up on winners and trending. PotW/PotM are standings computed when you read those boards, not a second write-time contest you can buy.

7. Aftercare (the part most people skip)

Rank day is not the asset. The listing, badge, and alternatives placement are.

  • Leave the Featured-on badge up if you used free dofollow. Removing it can break the free deal later (we may warn and recrawl).
  • Point your changelog or footer at the MakerHunt listing.
  • Copy PotD/W/M embeds only if you earned them. Do not swap Featured-on for a fake PotD asset.
  • Add yourself under relevant alternatives by choosing the right category slugs at submit time. Wrong categories bury you.
  • Capture one lesson: what copy converted, which channel sent real comments, what you would change on a second launch day.

Optional stack the same month: one directory batch, one honest review ask, and Product Hunt only if you still have campaign energy left.

Launching again

You can submit again as a new listing (new slug) for a future UTC day. Each listing has its own votes and Pot* eligibility; totals do not stack. Treat a second day as a new campaign with new proof, not a rank exploit. If nothing changed on the product, another day mostly trains people to ignore you. See FAQ.

FAQ

Can I pick a launch date weeks out on free?
No. Free is next day after crawl.

Can I pick a date on paid?
Paid also schedules the next UTC day after payment, not a multi-month free calendar. If you need a specific public date, time your checkout (or crawl) so “next day” lands on the UTC date you want.

Can I relaunch?
Yes within product allowances. Treat it as a new campaign.

What if crawl fails?
Fix the homepage markup, re-run crawl from the dashboard, or pay / ask for a manual override. See add Featured-on badge.

Does Featured €19 guarantee PotD?
No. Votes decide PotD. Featured is feed chrome + home Featured slot.

Do comments count toward PotD?
No. Day rank is upvotes. Comments help trust and conversion.

Where do rules live for newcomers?
FAQ, votes and PotD, and the posts linked above.

Should I launch on MakerHunt and Product Hunt the same day?
Usually no. Both need attention. Stack them across days if you can.

Next step

Run the checklist, then submit. If you are still choosing a discovery stack, read Product Hunt alternatives 2026. If badges confuse you, start with Featured-on badge guide.

Related on MakerHunt

Categories: saas